Successful collaboration on M4 Elevated Section

Techjoint recently carried out a contract on the M4 elevated section in partnership with Connect Plus, Osborne, RPM, and IKO, to succesfully install over 500 tonnes of IKO’s Permatrack H mastic asphalt.